Whole Section

  • 2.2 Emergency response during crisis

    • 2.2.1

      A Member should establish and maintain a crisis management plan as part of its business continuity plan. The crisis management plan should include (but not be limited to):

      (a) Emergency response procedures;
      (b) Roles and responsibilities of the crisis management team;
      (c) Command and control structures; and
      (d) Salvage and restoration procedures.

      Added on 3 June 20193 June 2019.

    • 2.2.2

      SGX-ST may declare a wide-area crisis in the event of a major and widespread incident. When such declaration is made, SGX-ST may require a Member to submit status reports to SGX-ST. A wide-area crisis may include any incident where the operations of a large number of market participants are disrupted simultaneously.

      Added on 3 June 20193 June 2019.