2.2.1
A Member should establish and maintain a crisis management plan as part of its business continuity plan. The crisis management plan should include (but not be limited to):
(a) Emergency response procedures;
(b) Roles and responsibilities of the crisis management team;
(c) Command and control structures; and
(d) Salvage and restoration procedures.
Added on 3 June 20193 June 2019.
2.2.2
SGX-ST may declare a wide-area crisis in the event of a major and widespread incident. When such declaration is made, SGX-ST may require a Member to submit status reports to SGX-ST. A wide-area crisis may include any incident where the operations of a large number of market participants are disrupted simultaneously.
Added on 3 June 20193 June 2019.